Over the last week, Manora Logistics transported, using pontoons and tugs, the 1400 ton jacket and the 2100 ton topside, constructed by Chantiers de l’Atlantique for the Saint Nazaire windfarm to the offshore field. Delivered alongside the vessel Pioneering Spirit, Allseas successfully installed the OSS. Great cooperation with all involved again.