Recent Projects

Demobilization from Palanga

For one of our regular customers, we handled the demobilization of equipment from Palanga in Lithuania to their homeport. The cargo included excavators, bulldozers, pipes, bends, anchors en other equipment loaded in containers. Due to total volume, all large pieces as well as the containers were loaded on deck. Another safe and sound completed project.

 

 

 

Transition Pieces for an offshore wind farm

Manora Logistics organized the transport of 27 transition pieces, each about 280 ton, 26 meter height and 5 meters diameter, for a new wind farm under construction in the UK. The loading took place on a pontoon that especially for this project has been equipped with a special grillage and sea fastening.

 

 

 


Two Cranes to the Middle East

Manora Logistics succesfully completed the delivery of 2 cranes, in 2 individual shipments, from Germany to the Middle East. Each crane had pieces upto 50 ton, and lengths upto 22 meters, and were loaded on containervessels, due to urgency and time sensitivity of the project.

 

 

 

 

 

Antonov Airfreight

Manora Logistics succesfully organized the transport of 6 rigs from Chile to Africa using an Antonov 124 – 100 ton version. The material was delivered in time and within budget, which lead the customer to state in a email :”Thanks to all, you guys rock”

Equipment

For one of our main customers, we handle all the equipment from Europe and Asia into Africa, including seafreight and airfreight. We have shipped small urgent parcels by air, handled consolidation containers with upto 187 different suppliers, and transported machinery including lifts of 66 ton.

Storage tanks

Throughout 2009 upto 2011, Manora Logistics organized the transport of well over 200 storage tanks, each measuring about 10 x 2,8 x 3 meters, mainly into Africa.

Onshore Windfarm

In our short history, we have been involved in several onshore wind farm projects, mainly in Europe and in the USA.

Steel shipments

As Antwerp company, situated in one of the largest steel ports, we regularly undertake transports of steel cargoes. Coils, plates or specialized steel related to wind farm (tower) production, we all deliver them in the most economical way and in time. We each year stuff also 500 containers with steel coils.

Offshore jackets

We assisted in the transport of 24 jackets for a offshore windfarm off the Belgian Coast, weighing each upto 575 ton.

Draghead to Mexico

We moved this 18 ton Draghead from Antwerp to Mexico with precarriage in Belgium and oncarriage till final destination in Mexico.

Stone Dumping Unit

We organized the complete transport of a stone dumping unit in 2011. The main unit weighed over 450 ton and even to us this machine was something special. It went from Rotterdam to Singapore, where it has meantime been installed on a newly build vessel

Factory removal

In 2011, we organized the complete factory removal of a 2800 ton aluminium press factory, including the packaging, transport and local delivery to the new site in Tianjin, China.